Pictures
Log
A log of all the work done to the House.
oDoT
Date
Description
Now
Replace front patio
Summer
2004 2005 2006
2007
Redo the stucco on the second floor.
Fall 2006
Paint the reading room roof.
Fall
2004 2005
2006
Paint exterior trim (color???)
Winter 2006/2007
Organize basement / workshop